Brief
To refurbish and extend the Bedser Stand cricket shop.
Aim
To assess the existing structure for proposed modifications, make recommendations on the proposals and to design replacement support structure.
Solution
After identification of
the
main grandstand
support elements, our recommendations to alter the proposed shop layout were adopted to minimise costly modifications to the existing structure. Increased shop floor area was achieved by opening-up compartment walls to interlink rooms which were previously of separate use and for which standard lintel beams were utilised.